Skip to main content

Fountain Creek Channel and Flood Restoration at Eagleridge

Eagleridge Project Focus Area

Located in Pueblo, Co near Eagleridge and I-25, the Eagleridge Focus Area was evaluated in 2021 and 2022 and it was determined that removal of the waterline crossing bollards, stabilization of the channel and connection of the floodplain at the extension of the Highway 47 project should be designed and constructed.  The planning and design of the project has progressed during 2022 and the project is scheduled for construction in the Fall of 2023.  Therefore, $4,300,000 in construction cost should be budgeted to complete the project.  Of the $296,897 design and construction contract administration contract amount approximately $170,000 is needed for the 2023 CIP.

In Design

Map of the Eagleridge Focus Area project area with colored zones indicating different restoration scores and areas, with a legend and coordinates.
Eagleridge Focus Area Map